7 May 2024

This bulletin provides advance notice of roadworks in Merton along with in progress works. We recognise that roadworks can cause inconvenience and we hope this information helps to minimise delays and allow you to plan alternative routes or choose more sustainable ways to travel.

A217 London Road / A216 Streatham Road, Mitcham

Directional Closure in place, with a full suspension and closure of the Bus Lane between Holborn Way and Locks Lane, Northbound Traffic on diversion via Western Road, Christchurch Road, A24 High Street Colliers Wood and Tooting High Street and Mitcham Road.

Works started 22 January to complete repairs on multiple gas leaks and mains replacement.

Works by SGN - Ref: XW200W120100207-03995, XW200W120218722-03995

 

Bedfont Close, Mitcham – Road Closure

Road Closure in place to enable carriageway resurfacing works.

Works starting 3 June and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00231054399

 
 

Burlington Road, New Malden – Two-way lights

Temporary lights in place outside 300 to enable a New Water connection to be made.

Works starting 10 June and are expected to take 5 Working Days.

Works by Thames Water – Ref: MU091SLS0081214964-0110

 
 

Bushey Road, Raynes Park – Lane Closure

Lane Closure in place outside David Lloyd to enable Cover Repair works.

Works starting 9 May and are expected to take 2 Working Days.

Works by Openreach – Ref: BC410LO0000050033982210

 
 

Bushey Road/A3/Beverley Way, Raynes Park – Road Closure

Bushey Road

Road Closure in place to enable Investigation and Inspections to TfL Structures.

Works starting 3 June and are expected to take 5 Working nights between 21:00 and 05:00.

Works by TfL – Ref: YG47578846971

Beverley Way

Road Closure in place to enable Investigation and Inspections to TfL Structures.

Works starting 10 June and are expected to take 5 Working nights between 21:00 and 05:00.

Works by TfL – Ref: YG47535474650

Bushey Road

Road Closure in place to enable Investigation and Inspections to TfL Structures.

Works starting 17 June and are expected to take 10 Working nights between 21:00 and 05:00.

Works by TfL – Ref: YG47557572174

All closures to have diversions in place and the junction with the A3 to be closed.

 
 

Courthope Villas, Darlaston Road and Worple Road, Wimbledon – Multi-way lights

Temporary lights in place to enable duct cleaning works and boxes and duct installation works.

Works starting 13 May and are expected to complete 22 May.

Works by Openreach – Ref:
Courthope Villas: BC312KN-FAMPRK-V9179-1 (13 May to 15 May)

Darlaston Road: BC112KN-FAMERT-V9121-2 (15 to 21 May Night Works 20:00 to 05:00)

Worple Road: BC312KN-FAMPRK-V9179-2 (13 May to 15 May)

Worple Road: BC112KN-FAMERT-V9121-1 (15 to 21 May Night Works 20:00 to 05:00)

 
 

Church Path, Wimbledon – Road Closure

Road Closure in place to enable carriageway resurfacing works.

Works starting 29 May and are expected to take 2 Working Day.

Works by Merton Council – Ref: HC00230170617

 
 

Church Road, Wimbledon – Two-way lights

Temporary traffic lights in place to enable repairs to a leaking water pipe.

Works starting 29 May and are expected to complete 31 May.

Works by Thames Water – Ref: MU083000032099677-001

 
 

Coombe Lane, Raynes Park – Multi-way lights

Temporary lights in place at the junction with Cambridge Road to enable a New Electricity supply to be made.

Works starting 13 May and are expected to take 5 Working days.

Works by UK Power Networks – Ref: EC40065448461

 
 

Church Road, Mitcham – Multi-way lights

Temporary traffic lights in place to enable New Water Connection to be completed to. Works at the junction with Hallowfield Way.

Works starting 30 May and are expected to take 2 Working Days.

Works by Thames Water – Ref: MU091SLS0081332678-0135

 
 

 
 

 
 

Cranbrook Road, Wimbledon – Multi-way lights

Multi-way lights at the junction with Worple Road to enable Water Mains Replacement works, Parking Suspensions the length of the road.

Works started 8 January and are expected to complete 8 August.

Works by Thames Water – Ref: MU0549823

 
 

Grand Drive, Raynes Park – Road Closure

Road Closure in place to enable Carriageway Resurfacing works between Southway and Church Walk.

Works starting 27 August and are expected to take 4 Nights between 20:00 and 05:00.

Works by Merton Council – Ref: HC00195002834

 
 

Grasmere Avenue, Wimbledon – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 8 August and are expected to take 2 Working Days.

Works by Merton Council – Ref: HC00271307238

 
 

Haydon’s Road, South Wimbledon – Lane Closure

Lane Closure in place between Haydon Park Road and Gap Road to enable Footway Upgrade and Entry treatment works to be completed.

Works started 7 May and are expected to complete 3 June.

Works by Merton Council – Ref: HC00181116382

 
 

Kingston Road, Raynes Park – Two-way lights

Temporary traffic lights in place between No.544 and junction with Dupont Road to enable new ducting to be laid on behalf of UK Power Networks.

Works starting 15 May and are expected to complete 24 May.

Works by Last Mile Electricity Limited – Ref: XV016UKP12112

 
 

Kingston Road, Wimbledon – Two-way lights

Temporary traffic lights in place outside 247 to enable duct maintenance and a New Customer Connection.

Works starting 13 May and are expected to take 2 Working Days.

Works by Virgin Media – Ref: NK110ANSL170835

 
 

Kingston Road and Kingswood Road, Wimbledon – Stop and Go Boards and Road Closure

Road Closure in place on Kingswood Road to enable siting of a crane to lift steelwork into place. Stop and Go Boards on Kingston Road to create a safety zone during lifting operations.

Works starting 27 July and are expected to take 1 Day.

Works by Cellnex – Ref: G5001238354-WHP-LS01, G5001238354-WHP-LS04

 
 

 
 

Links Avenue, Morden – Road Closure

Road Closure in place to enable inspections of Rail Bridge.

Works starting 7 September at 01:30 and are expected to complete 23:59 on 8 September.

Works by Network Rail – Ref: KL815SMS2-9-9-070924

 
 

Madeira Road, Mitcham – Multi-way lights

Temporary traffic lights in place to enable junction improvement and staggered pedestrian crossing to be constructed.

Works started 2 April and are expected to completed 7 May.

Works by Merton Council – Ref: HC00292035942

 
 

Manor Road, Mitcham – Road Closure

Road Closure in place to enable Carriageway Resurfacing works between Commonside East ad Sherwood Park Road.

Works starting 7 June and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00251759942

 
 

Marian Road, Streatham – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 10 July and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00250566431

 
 

Melbourne Road, South Wimbledon – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 31 May and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00280230675

 
 

Melrose Road, Wimbledon – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 5 June and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00246696240

 
 

Middleton Road, Morden – Road Closure

Road Closure in place to enable Carriageway Resurfacing works, between St Helier Avenue and Canterbury Road.

Works starting 15 July and are expected to take 2 Nights between 20:00 and 05:00.

Works by Merton Council – Ref: HC00214847619

 
 

Mostyn Road, Wimbledon – Road Closure

Road Closure in place to enable Carriageway Resurfacing works between Kingston Road and Sheridan Road.

Works starting 28 May and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00200580713

 
 

Oldfield Road, Wimbledon – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 5 June and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00235008060

 
 

Pollard Road, Morden – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 11 July and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00269777995

 
 

Radnor Close, Mitcham – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 12 July and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00238785632

 
 

Rectory Orchard, Wimbledon – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 6 June and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00274236649

 
 

Ridgway, Wimbledon – Two-way lights

Temporary traffic lights in place outside Kings Court to enable safe access to underground assets.

Works starting 20 May and are expected to take 2 working days.

Works by Openreach – Ref: BC008WFHLGJ2D04

 
 

Ridgway, Wimbledon – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 12 August and are expected to take 4 Nights between 20:00 and 05:00.

Works by Merton Council – Ref: HC00274248718

 
 

Russell Road, Mitcham – Road Closure

Road Closure in place to enable Mains Replacement Works between Love Lane and Glebe Path.

Works started 1 May and are expected to complete 10 June.

Works by Thames Water – Ref: MU054MIT4-RUSS143

 
 

Sheldrick Close, Colliers Wood – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 9 July and are expected to take 1 Working Day.

Works by Merton Council – Ref: HC00230344586

 
 

 
 

 
 

Station Road, New Malden – Road Closure

Road Closure in place with parking bay suspensions and Pedestrian Diversions in place to enable setting up of a compound and demolition of Network Rail buildings and structures ahead of and during Station Refurbishment works and footbridge replacement works.

Works expected to complete 12 July.

Works by Network Rail – Ref: KL142RPE-9-57-180523

 
 

Stanford Road, Streatham – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 19 August and are expected to take 4 Working Day.

Works by Merton Council – Ref: HC00228021639

 
 

Strathearn Road – Two-way lights

Temporary lights in place outside 47 to enable New Customer Connections to be laid across the Road.

Works starting 11 June and are expected to complete 20 June.

Works by SGN – Ref: XW073W120295626

 
 

Tudor Drive, Morden – Two-way lights

Temporary lights in place to enable Telegraph Pole replacement works.

Works starting 27 May and are expected to take 1 Day.

Works by Openreach – Ref: BC008WFKM680N

 
 

Upper Green West, Mitcham – Road Closure

Road Closure in place to enable water mains replacement works.

Works starting 11 June and are expected to take 29 Working Days.

Works by Thames Water – Ref: MU054MIT4-UPGRNWST118

 
 

Vectis Road, Tooting – Road Closure

Road Closure in place to enable Carriageway Resurfacing works.

Works starting 8 July and are expected to take 2 Working Days.

Works by Merton Council – Ref: HC00207925453

 
 

West Barnes Lane, Raynes Park – Road Closure

Road Closure in place at the Raynes Park Crossing to enable Inspections, Access, or Maintenance to be carried out to the level crossing.

Works starting 23 June and are expected to take 2 nights between 01:00 and 04:00.

Ref: KL170RPE-09-18-230624

Works starting 19 July and are expected to take 1 nights between 23:00 and 06:00.

Ref: KL156RPE-09-18-190724

Works by Network Rail

 
 

West Barnes Lane, New Malden – Road Closure

Road Closure in place at the New Malden Crossing to enable Inspections, Access, or Maintenance to be carried out to the level crossing.

Works starting 14 May and are expected to take 4 nights between 00:05 and 05:00.

Ref: KL156RPE-09-64-140524

Works starting 18 June and are expected to take 4 nights between 00:01 and 05:00.

Ref: KL156RPE-09-64-180624

Works by Network Rail

 
 

Worple Road, Wimbledon – Multi-way lights

Temporary traffic lights in place to enable Water Mains Replacement works between Cranbrook Road and Elm Grove.

Works started 8 January and are expected to complete 8 August.

Works by Thames Water – Ref: MU0549823-01

 
 

Worple Road, Wimbledon – Two-way lights

Temporary traffic lights in place outside 180 to enable reconstruction of a joint chamber.

Works starting 9 May and are expected to take 2 Working Days.

Works by Virgin Media – Ref: NK102VM_CIP_442771

Water leaks, gas leaks and power failures

The following freephone numbers should be used to report leaks or power failures:

Water: 0800 714 614

Gas: 0800 111 999

Electricity: 105 or 0800 31 63 105

Please do not assume that someone else has phoned it in. Please do not report these to the Council.