Current projects

There are no current projects.

Completed works

  • Spa London
  • Refurbishment works to the reception and gym areas
  • Replacement of skylights over gym area
  • Installation of new boiler
  • Removal of redundant pipework
  • Repairs to the main pool filters in the plant room
  • Work in the tunnels under the centre
  • Maintenance works to the skylights within the centre
  • Maintenance works to various areas of the roof
  • Works to emergency lighting in the main pool hall
  • Replacement of the main water tank
  • External redecoration of the Latimer Road face of the centre, including pigeon proofing of the whole area
  • Replacement of the lighting in the teaching pool
  • Replacement to some lighting in the plant room
  • Works to clear the former warm baths area
  • Assorted health and safety required works
  • Replacement boiler works
  • Emergency lighting inspection and various repairs
  • Condition Survey Report
  • 5 year electrical testing and any necessary repairs
  • Lightening conductor test and repairs
  • Chimney inspections
  • Clock repairs
  • Pressurisation unit repair works
  • Table tennis room repairs (formerly table tennis, now meeting room)
  • Installation of changing village
  • Pump works
  • New chemical dosing system
  • Changing room refurbishment
  • Bicycle racks
  • Electrical panel replacement
  • Chemical descale of calorifiers
  • Various valve repairs
  • CCTV installation